Orchard Ridge Landfill Expansion

9 acres of Cell Construction

200,000 cubic yards of mass excavation

60,000 cubic yards clay liner placement

30 acres of cover work

Over 300,000 cubic yards of excavation on cover

Installation of Methane Gas Liners

Access Road Building

New Chester Dairy

Through 2011-2013, Mueller Excavating worked with New Chester Dairy on a ground up construction made up of 175 acres.

With over 1,000,000 cubic yards of earthmoving, we installed miles of piping for manure distribution as well as water. Clay liners were used for 30+ acres of concrete. Also, we excavated for the digester.

Rosendale Dairy

Through 2008-2010, Mueller Excavating worked with Rosendale Dairy (Milksource Inc).

There were approximately 1,000,000 cubic yards excavation during the total construction.

GPS grading early adopter at that time.

Installed miles of force main for manure distribution & water

Average of site work was approximately 125 acres

Installed 150,000 tons of gravel for concrete and pavement acres

Footings for buildings

Clay liners for ponds & lagoons

Glacier Ridge Landfill

In 2014 and 2015 Mueller Excavating worked with Advanced Disposal in a 3 stage process in cell expansion. We also were involved in a 12.6 acre cover project.


70,000 cubic yards of clay hauled in from 30 miles away

We ran approximately 50 quad axles per day

Loaded with 3 Excavators

Also, In 2014 and 2015 Mueller Excavating worked with Advanced Disposal in a 3 stage process in cell expansion. We also were involved in a 12.6 acre cover project.

Emerald Park Landfill

In 2013 Mueller Excavating worked with Advanced Disposal in a large 7 acre cell expansion project. During this project the Mueller Excavating crew moved a total of about 750 thousand yards of earth, with about 600 thousand yards being clay.

Oneida Lake

Through 2019-2021, Mueller Excavating worked with Oneida Nation for an expansion of a 30+ acre man made lake. A Sledding Hill was constructed using the excavated material. Also, a 1/5 mile walking trail was created as well as camper pads.

600,000 cubic yards of excavation

Clay lined the lake to help hold the water.

Pine Breeze Dairy

In 2012 Mueller Excavating worked with the Breeze Dairy Group. We worked on building their new addition, Pine Breeze Dairy. Pine Breeze is the home to 2,400 cows.

Milk Source, Inc.

Mueller Excavating has had the opportunity to work with Milk Source, inc. at several different dairy farms spread across the state of Wisconsin and stretching to the state of Michigan. Several of these farms now house about 8,000 cows. While building two of the larger dairies, Mueller Excavating moved close to 1 million cubic yards of earth on each operation.


In 2015 and 2016 Mueller Excavating again has an opportunity to work with Milk Source, in the Grand Marsh Area. The Mueller Excavating Utility Crew is laying 65,000 feet of C-900 manure line. These manure lines have riser pipes strategically placed in the middle of fields. Mueller Excavating also pressure test all lines to ensure there will not be leaks throughout.

Menard, Inc - IRON RIDGE
  
Through 2010 - 2014, Mueller Excavating worked with Menards, performing the excavation and utility for a concrete block plant in Iron Ridge, Wisconsin. This project included 500 thousand cubic yards of excavation, 125 thousand yards of stone base, storm sewer and water main and the excavation of footings for all site facilities. Then again through 2021-2022, Mueller Excavating worked with Menards on their Truss Plant, Aggregate Block Plant and Warehousing.

We moved nearly 1,000,000 cubic yards of dirt over the course of the construction. This was a 100 acre site project, 60 acres were gravel, concrete and buildings. The largest cut from the existing grade was 58 feet. Also, a railroad spur and parking for 200+ semi-trailers was added.